• Zarija Vujoševića 8, Novi Beograd
  • Mon - Fri 8:00 - 16:00

Contact

Contact us

Do you have a question?
Write to us!

    Zarija Vujoševića 8, 11070 Novi Beograd

    Industrijska bb, 21000 Novi Sad

    REFERENCES
    ProjectsObjectsPeriodLocationStatus
    1Execution of Works on Construction of the Highway E763, Section Preljina-Pozega, Subsection VConstruction of bridges no. 29, 30, 31, 32, 33, bridge over Moravica river, overpass at line 2 and bridge at km 0+173.332022 - 2023Auto-put E-763; deonica Preljina - Požega, Poddeonica 5in progress
    2State road Ib category no. 27 Loznica - Valjevo - Lazarevac, section Iverak - LajkovacBridges 12, 202022 - 2023Valjevo-Lajkovacin progress
    3Construction of local road Stapar - Sivac (the third stage)Construction of the RC bridge on the road Stapar-Sivac at km 8+830.42, over the canal Kosancic - Mali Stapar2022 - 2023Sivacin progress
    4Performing embankment rehabilitation works from km 195+805 to km 195+870 - "Stojanov most"Stojanov most2022 - 2023Zlatiborfinished
    5Works on the replacement of the existing steel structure with a new steel structure of the bridge at km 4+871.5 on railway no. 219: (Nis) - Prahovo Prist.Bridge at km 4+871.5 on railway no. 219: (Nis) - Prahovo Prist.2022Nišfinished
    6Execution of Works on Construction of the Highway E763, Section Preljina-Pozega, Subsection IIIBridge in interchange no. 1, Bridges no. 5, 7, Overpass no. 4,5, 62021 - 2022Auto-put E-763; deonica Preljina - Požega, Poddeonica 3finished
    7Modernization and reconstruction of Hungarian-Serbian railway connection in the territory of the Republic of Serbia for section Belgrade Center – Stara PazovaOverpass at km 34+696.442020 - 2022Stara Pazovafinished
    8
    Modernization and reconstruction of Hungarian-Serbian railway connection in the territory of the Republic of Serbia for section Belgrade Center – Stara Pazova
    Overpass at 13+2882020 - 2022Zemun poljefinished
    9
    Works on the rehabilitation of the slope from km 59+100 to km 59+210 on the railway Crveni Krst-Zajecar-Prahovo Pristaniste
    Slope from km 59+100 to km 59+210 on the railway Crveni Krst-Zajecar-Prahovo Pristaniste2021 - 2022od km 59+100 do km 59+210 na pruzi Crveni Krst-Zaječar Prahovo Pristaništefinished
    10Repair of damaged parts of the bridge at km 117+097 of the Stalać-Kraljevo-Požega railwayBridge at km 117+0972021Međuvršjefinished