• Industrijska 2G, Novi Sad
  • Mon - Fri 8:00 - 16.00

About us

Get To Know Us

Bricken Company

The company BRICKEN d.o.o. was founded in 2020, with headquarters in Novi Sad.
Within the company team, five civil engineers are employed who hold appropriate personal licenses issued by the Engineering Chamber of Serbia.
We build bridges, overpasses and tunnels, and our projects include some of the largest and most challenging construction projects in the Republic of Serbia. We have implemented several of the largest and most complex projects in the field of bridge and tunnel construction in the country.
We have implemented several of the largest and most complex projects in the field of bridge and tunnel construction in the country.
With its personnel potential, which consists of engineers with many years of experience in the construction of bridges, overpasses and tunnels, equipment and technical means at its disposal, Bricken d.o.o. is able to realize each project with the highest quality and commitment.

We perform all activities in accordance with the international standards ISO 9001, 14001 and 45001. We constantly improve our business system, which is necessary for the successful implementation of various projects.

WE HAVE IMPLEMENTED SEVERAL OF THE LARGEST AND MOST COMPLEX PROJECTS IN THE FIELD OF BRIDGE AND TUNNEL CONSTRUCTION IN THE COUNTRY

%
Innovativeness

Realizovali smo nekoliko najvećih i najkompleksnijih projekata iz oblasti izgradnje mostova i tunela u zemlji.

Sa svojim kadrovskim potencijalom, koji čine inženjeri sa višegodišnjim iskustvom u izgradnji mostova, nadvožnjaka i tunela, opremom i tehničkim sredstvima kojima raspolaže, Bricken d.o.o. je u mogućnosti da svaki projekat realizuje sa najvećim kvalitetom i posvećenošću.

Sve aktivnosti obavljamo u skladu sa međunarodnim standardima ISO 9001, 14001 i 45001. Konstatno unapređujemo svoj poslovni sistem koji je neophodan za uspešnu realizaciju raznovrsnih projekata.

%
Inovativnost

REFERENCES

Project Objects Period Location Status
Design for construction of the new Jovanovac – Rasputnica – Cvetojevac – Sobovica railway line Overpass at km 0+801.64; bridge at chainage km 2+214.07; bridge at chainage km 0+404.61; bridge at chainage km 0+105.79; piled retaining structure from chainage km 0+150 to km 0+216.27; platform retaining walls at the stop. 2024 Kragujevac In progress
Construction of a railway bridge over the Tamiš River at chainage km 63+104.62 on the Pančevo Main – Zrenjanin – Kikinda – State Border railway line The railway bridge over the Tamiš River 2024/2025 Orlovat Finished
Execution of Works on Construction of the Highway E763, Section Preljina – Požega, Subsection V Construction of bridges no. 29, 30, 31, 32, 33, bridge over Moravica river, overpass at line 2 and bridge at km 0+173.33 2022 – 2023 Highway E-763; Section Preljina – Požega, Subsection 5 Finished
State road Ib category no. 27 Loznica – Valjevo – Lazarevac, section Iverak – Lajkovac Bridges 12, 20 2022 – 2023 Valjevo – Lajkovac Finished
Construction of local road Stapar – Sivac (the third stage) Construction of the RC bridge on the road Stapar – Sivac at km 8+830.42, over the canal Kosančić – Mali Stapar 2022 – 2023 Sivac Finished
Performing embankment rehabilitation works from km 195+805 to km 195+870 – "Stojanov most" Stojanov most 2022 – 2023 Zlatibor Finished
Works on the replacement of the existing steel structure with a new steel structure of the bridge at km 4+871.5 on railway no. 219: (Niš) – Prahovo Prist. Bridge at km 4+871.5 on railway no. 219: (Niš) – Prahovo Prist. 2022 Niš Finished
Execution of Works on Construction of the Highway E763, Section Preljina – Požega, Subsection III Bridge in interchange no. 1, Bridges no. 5, 7, Overpass no. 4, 5, 6 2021 – 2022 Highway E-763; Section Preljina – Požega, Subsection 3 Finished
Modernization and reconstruction of Hungarian-Serbian railway connection in the territory of the Republic of Serbia for section Belgrade Center – Stara Pazova Overpass at km 34+696.44 2020 – 2022 Stara Pazova Finished
Modernization and reconstruction of Hungarian-Serbian railway connection in the territory of the Republic of Serbia for section Belgrade Center – Stara Pazova Overpass at km 13+288 2020 – 2022 Zemun polje Finished
Works on the rehabilitation of the slope from km 59+100 to km 59+210 on the railway Crveni Krst – Zaječar – Prahovo Pristanište Slope from km 59+100 to km 59+210 on the railway Crveni Krst – Zaječar – Prahovo Pristanište 2021 – 2022 From km 59+100 to km 59+210 on the railway Crveni Krst – Zaječar – Prahovo Pristanište Finished
Repair of damaged parts of the bridge at km 117+097 of the Stalać – Kraljevo – Požega railway Bridge at km 117+097 2021 Međuvršje Finished

REFERENCE

Projekat Objekti Period Lokacija Status
Projektovanje izvođenja radova na izgradnji nove železničke pruge Jovanovac-Rasputnica-Cvetojevac-Sobovica Nadvožnjak na km 0+801.64, most na km 2+214.07, most na km 0+404.61, most na km 0+105.79, potporna konstrukcija od šipova od km 0+150 do km 0+216.27, peronski zidovi stajališta. 2024 Kragujevac U toku
Izgradnja železničkog mosta preko reke Tamiš u km 63+104.62 pruge Pančevo glavna – Zrenjanin – Kikinda – Državna granica Železnički most na Tamišu 2024/2025 Orlovat Završeno
Izgradnja auto-puta E-763, deonica Preljina – Požega, Poddeonica 5 Izgradnja mostova br. 29, 30, 31, 32, 33, mosta preko reke Moravice, nadvožnjaka na kraku 2 i mosta na km 0+173.33. 2022 – 2023 Auto-put E-763; deonica Preljina – Požega, Poddeonica 5 Završeno
Državni put Ib kategorije br. 27 Loznica – Valjevo – Lazarevac, deonica Iverak – Lajkovac Mostovi 12, 20 2022 – 2023 Valjevo – Lajkovac Završeno
Izgradnja lokalnog puta Stapar – Sivac (treća etapa) Izgradnja AB mosta na putu Stapar – Sivac na stacionaži km 8+830.42, preko kanala Kosančić – Mali Stapar 2022 – 2023 Sivac Završeno
Izvođenje radova sanacije nasipa od km 195+805 do km 195+870 – Stojanov most Stojanov most 2022 – 2023 Zlatibor Završeno
Radovi na zameni postojeće čelične konstrukcije novom čeličnom konstrukcijom mosta u km 4+871,5 na pruzi br. 219 (Niš) – Crveni Krst – Zaječar – Prahovo Pristanište Most u km 4+871,5 na pruzi br. 219 (Niš) – Crveni Krst – Zaječar – Prahovo Pristanište 2022 Niš Završeno
Izgradnja auto-puta E-763; deonica Preljina – Požega, Poddeonica 3 Most u petlji br. 1, Most br. 5, Most br. 7, Nadvožnjak br. 4, Nadvožnjak br. 5, Nadvožnjak br. 6 2021 – 2022 Auto-put E-763; deonica Preljina – Požega, Poddeonica 3 Završeno
Modernizacija pruge Beograd – Subotica – državna granica (Kelebija); Deonica Zemun polje – Batajnica Nadvožnjak km 34+696,44 2020 – 2022 Stara Pazova Završeno
Modernizacija pruge Beograd – Subotica – državna granica (Kelebija); Deonica Zemun polje – Batajnica Nadvožnjak km 13+288 2020 – 2022 Zemun polje Završeno
Radovi na sanaciji kosine od km 59+100 do km 59+210 na pruzi Crveni Krst – Zaječar – Prahovo Pristanište Kosine od km 59+100 do km 59+210 na pruzi Crveni Krst – Zaječar – Prahovo Pristanište 2021 – 2022 od km 59+100 do km 59+210 na pruzi Crveni Krst – Zaječar – Prahovo Pristanište Završeno
Popravka oštećenih delova mosta u km 117+097 pruge Stalać – Kraljevo – Požega Most u km 117+097 pruge Stalać – Kraljevo – Požega 2021 Međuvršje Završeno