The company BRICKEN d.o.o. was founded in 2020, with headquarters in Novi Sad. We build bridges, overpasses and tunnels, and our projects include some of the largest and most challenging construction projects in the Republic of Serbia. We have implemented several of the largest and most complex projects in the field of bridge and tunnel construction in the country.
We have implemented several of the largest and most complex projects in the field of bridge and tunnel construction in the country.
With its personnel potential, which consists of engineers with many years of experience in the construction of bridges, overpasses and tunnels, equipment and technical means at its disposal, Bricken d.o.o. is able to realize each project with the highest quality and commitment.
We perform all activities in accordance with the international standards ISO 9001, 14001 and 45001. We constantly improve our business system, which is necessary for the successful implementation of various projects.
Realizovali smo nekoliko najvećih i najkompleksnijih projekata iz oblasti izgradnje mostova i tunela u zemlji.
Sa svojim kadrovskim potencijalom, koji čine inženjeri sa višegodišnjim iskustvom u izgradnji mostova, nadvožnjaka i tunela, opremom i tehničkim sredstvima kojima raspolaže, Bricken d.o.o. je u mogućnosti da svaki projekat realizuje sa najvećim kvalitetom i posvećenošću.
Sve aktivnosti obavljamo u skladu sa međunarodnim standardima ISO 9001, 14001 i 45001. Konstatno unapređujemo svoj poslovni sistem koji je neophodan za uspešnu realizaciju raznovrsnih projekata.
REFERENCES |
|||||
Projects | Objects | Period | Location | Status | |
1 | Execution of Works on Construction of the Highway E763, Section Preljina-Pozega, Subsection V | Construction of bridges no. 29, 30, 31, 32, 33, bridge over Moravica river, overpass at line 2 and bridge at km 0+173.33 | 2022 - 2023 | Auto-put E-763; deonica Preljina - Požega, Poddeonica 5 | in progress |
2 | State road Ib category no. 27 Loznica - Valjevo - Lazarevac, section Iverak - Lajkovac | Bridges 12, 20 | 2022 - 2023 | Valjevo-Lajkovac | in progress |
3 | Construction of local road Stapar - Sivac (the third stage) | Construction of the RC bridge on the road Stapar-Sivac at km 8+830.42, over the canal Kosancic - Mali Stapar | 2022 - 2023 | Sivac | in progress |
4 | Performing embankment rehabilitation works from km 195+805 to km 195+870 - "Stojanov most" | Stojanov most | 2022 - 2023 | Zlatibor | finished |
5 | Works on the replacement of the existing steel structure with a new steel structure of the bridge at km 4+871.5 on railway no. 219: (Nis) - Prahovo Prist. | Bridge at km 4+871.5 on railway no. 219: (Nis) - Prahovo Prist. | 2022 | Niš | finished |
6 | Execution of Works on Construction of the Highway E763, Section Preljina-Pozega, Subsection III | Bridge in interchange no. 1, Bridges no. 5, 7, Overpass no. 4,5, 6 | 2021 - 2022 | Auto-put E-763; deonica Preljina - Požega, Poddeonica 3 | finished |
7 | Modernization and reconstruction of Hungarian-Serbian railway connection in the territory of the Republic of Serbia for section Belgrade Center – Stara Pazova | Overpass at km 34+696.44 | 2020 - 2022 | Stara Pazova | finished |
8 | Modernization and reconstruction of Hungarian-Serbian railway connection in the territory of the Republic of Serbia for section Belgrade Center – Stara Pazova | Overpass at 13+288 | 2020 - 2022 | Zemun polje | finished |
9 | Works on the rehabilitation of the slope from km 59+100 to km 59+210 on the railway Crveni Krst-Zajecar-Prahovo Pristaniste | Slope from km 59+100 to km 59+210 on the railway Crveni Krst-Zajecar-Prahovo Pristaniste | 2021 - 2022 | od km 59+100 do km 59+210 na pruzi Crveni Krst-Zaječar Prahovo Pristanište | finished |
10 | Repair of damaged parts of the bridge at km 117+097 of the Stalać-Kraljevo-Požega railway | Bridge at km 117+097 | 2021 | Međuvršje | finished |
REFERENCE |
|||||
Projekti | Objekti | Period | Lokacija | Status | |
1 | Izgradnje auto-puta E-763, deonica Preljina - Požega, Poddeonica 5 | Izgradnja mostova br. 29, 30, 31, 32, 33, mosta preko reke Moravice, nadvožnjaka na kraku 2 i mosta na km 0+173.33. | 2022 - 2023 | Auto-put E-763; deonica Preljina - Požega, Poddeonica 5 | u toku |
2 | Državni put Ib kategorije br. 27 Loznica – Valjevo – Lazarevac, deonica Iverak – Lajkovac | Mostovi 12, 20 | 2022 - 2023 | Valjevo-Lajkovac | u toku |
3 | Izgradnja lokalnog puta Stapar - Sivac (treća etapa) | Izgradnja AB mosta na putu Stapar-Sivac na stacionaži km 8+830.42, preko kanala Kosančić - Mali Stapar | 2022 - 2023 | Sivac | u toku |
4 | Izvođenje radova sanacije nasipa od km 195+805 do km 195+870 - Stojanov most | Stojanov most | 2022 - 2023 | Zlatibor | završeno |
5 | Radovi na zameni postojeće čelične konstrukcije novom čeličnom konstrukcijom mosta u km 4+871,5 na pruzi br. 219 (Niš)-Crveni Krst-Zaječar-Prahovo Pristanište | Most u km 4+871,5 na pruzi br. 219 (Niš)-Crveni Krst-Zaječar-Prahovo Pristanište | 2022 | Niš | završeno |
6 | Izgradnja auto-puta E-763; deonica Preljina - Požega, Poddeonica 3 | Most u petlji br. 1, Most br. 5, Most br. 7, Nadvožnjak br. 4, Nadvožnjak br. 5, Nadvožnjak br. 6 | 2021 - 2022 | Auto-put E-763; deonica Preljina - Požega, Poddeonica 3 | završeno |
7 | Modernizacija pruge Beograd-Subotica-državna granica (Kelebija); Deonica Zemun polje-Batajnica | Nadvožnjak km 34+696,44 | 2020 - 2022 | Stara Pazova | završeno |
8 | Modernizacija pruge Beograd-Subotica-državna granica (Kelebija); Deonica Zemun polje-Batajnica | Nadvožnjak km 13+288 | 2020 - 2022 | Zemun polje | završeno |
9 | Radovi na sanaciji kosine od km 59+100 do km 59+210 na pruzi Crveni Krst-Zaječar-Prahovo Pristanište | Kosine od km 59+100 do km 59+210 na pruzi Crveni Krst-Zaječar Prahovo Pristanište | 2021 - 2022 | od km 59+100 do km 59+210 na pruzi Crveni Krst-Zaječar Prahovo Pristanište | završeno |
10 | Popravka oštećenih delova mosta u km 117+097 pruge Stalać-Kraljevo-Požega | Most u km 117+097 pruge Stalać-Kraljevo-Požega | 2021 | Međuvršje | završeno |