Izgradnja lokalnog puta Stapar – Sivac (treća etapa)

Izgradnja lokalnog puta Stapar – Sivac (treća etapa)

Izgradnja lokalnog puta Stapar – Sivac (treća etapa)

Izgradnja AB mosta na putu Stapar-Sivac na stacionaži km 8+830.42, preko kanala Kosančić – Mali Stapar

Most Sivac

Period

2022 - 2023

Izvođač

Bricken

Lokacija

Sivac

Status

u toku

Izgradnja, modernizacija i rekonstrukcija mostova i tunela

  • Industrijska bb, 21000 Novi Sad
  • Zarija Vujoševića 8, Novi Beograd
  • © Sva prava zadržana 2023 Bricken DOO
Developed by SectionOne

REFERENCES

Project Objects Period Location Status
Design for construction of the new Jovanovac – Rasputnica – Cvetojevac – Sobovica railway line Overpass at km 0+801.64; bridge at chainage km 2+214.07; bridge at chainage km 0+404.61; bridge at chainage km 0+105.79; piled retaining structure from chainage km 0+150 to km 0+216.27; platform retaining walls at the stop. 2024 Kragujevac In progress
Construction of a railway bridge over the Tamiš River at chainage km 63+104.62 on the Pančevo Main – Zrenjanin – Kikinda – State Border railway line The railway bridge over the Tamiš River 2024/2025 Orlovat Finished
Execution of Works on Construction of the Highway E763, Section Preljina – Požega, Subsection V Construction of bridges no. 29, 30, 31, 32, 33, bridge over Moravica river, overpass at line 2 and bridge at km 0+173.33 2022 – 2023 Highway E-763; Section Preljina – Požega, Subsection 5 Finished
State road Ib category no. 27 Loznica – Valjevo – Lazarevac, section Iverak – Lajkovac Bridges 12, 20 2022 – 2023 Valjevo – Lajkovac Finished
Construction of local road Stapar – Sivac (the third stage) Construction of the RC bridge on the road Stapar – Sivac at km 8+830.42, over the canal Kosančić – Mali Stapar 2022 – 2023 Sivac Finished
Performing embankment rehabilitation works from km 195+805 to km 195+870 – "Stojanov most" Stojanov most 2022 – 2023 Zlatibor Finished
Works on the replacement of the existing steel structure with a new steel structure of the bridge at km 4+871.5 on railway no. 219: (Niš) – Prahovo Prist. Bridge at km 4+871.5 on railway no. 219: (Niš) – Prahovo Prist. 2022 Niš Finished
Execution of Works on Construction of the Highway E763, Section Preljina – Požega, Subsection III Bridge in interchange no. 1, Bridges no. 5, 7, Overpass no. 4, 5, 6 2021 – 2022 Highway E-763; Section Preljina – Požega, Subsection 3 Finished
Modernization and reconstruction of Hungarian-Serbian railway connection in the territory of the Republic of Serbia for section Belgrade Center – Stara Pazova Overpass at km 34+696.44 2020 – 2022 Stara Pazova Finished
Modernization and reconstruction of Hungarian-Serbian railway connection in the territory of the Republic of Serbia for section Belgrade Center – Stara Pazova Overpass at km 13+288 2020 – 2022 Zemun polje Finished
Works on the rehabilitation of the slope from km 59+100 to km 59+210 on the railway Crveni Krst – Zaječar – Prahovo Pristanište Slope from km 59+100 to km 59+210 on the railway Crveni Krst – Zaječar – Prahovo Pristanište 2021 – 2022 From km 59+100 to km 59+210 on the railway Crveni Krst – Zaječar – Prahovo Pristanište Finished
Repair of damaged parts of the bridge at km 117+097 of the Stalać – Kraljevo – Požega railway Bridge at km 117+097 2021 Međuvršje Finished

REFERENCE

Projekat Objekti Period Lokacija Status
Projektovanje izvođenja radova na izgradnji nove železničke pruge Jovanovac-Rasputnica-Cvetojevac-Sobovica Nadvožnjak na km 0+801.64, most na km 2+214.07, most na km 0+404.61, most na km 0+105.79, potporna konstrukcija od šipova od km 0+150 do km 0+216.27, peronski zidovi stajališta. 2024 Kragujevac U toku
Izgradnja železničkog mosta preko reke Tamiš u km 63+104.62 pruge Pančevo glavna – Zrenjanin – Kikinda – Državna granica Železnički most na Tamišu 2024/2025 Orlovat Završeno
Izgradnja auto-puta E-763, deonica Preljina – Požega, Poddeonica 5 Izgradnja mostova br. 29, 30, 31, 32, 33, mosta preko reke Moravice, nadvožnjaka na kraku 2 i mosta na km 0+173.33. 2022 – 2023 Auto-put E-763; deonica Preljina – Požega, Poddeonica 5 Završeno
Državni put Ib kategorije br. 27 Loznica – Valjevo – Lazarevac, deonica Iverak – Lajkovac Mostovi 12, 20 2022 – 2023 Valjevo – Lajkovac Završeno
Izgradnja lokalnog puta Stapar – Sivac (treća etapa) Izgradnja AB mosta na putu Stapar – Sivac na stacionaži km 8+830.42, preko kanala Kosančić – Mali Stapar 2022 – 2023 Sivac Završeno
Izvođenje radova sanacije nasipa od km 195+805 do km 195+870 – Stojanov most Stojanov most 2022 – 2023 Zlatibor Završeno
Radovi na zameni postojeće čelične konstrukcije novom čeličnom konstrukcijom mosta u km 4+871,5 na pruzi br. 219 (Niš) – Crveni Krst – Zaječar – Prahovo Pristanište Most u km 4+871,5 na pruzi br. 219 (Niš) – Crveni Krst – Zaječar – Prahovo Pristanište 2022 Niš Završeno
Izgradnja auto-puta E-763; deonica Preljina – Požega, Poddeonica 3 Most u petlji br. 1, Most br. 5, Most br. 7, Nadvožnjak br. 4, Nadvožnjak br. 5, Nadvožnjak br. 6 2021 – 2022 Auto-put E-763; deonica Preljina – Požega, Poddeonica 3 Završeno
Modernizacija pruge Beograd – Subotica – državna granica (Kelebija); Deonica Zemun polje – Batajnica Nadvožnjak km 34+696,44 2020 – 2022 Stara Pazova Završeno
Modernizacija pruge Beograd – Subotica – državna granica (Kelebija); Deonica Zemun polje – Batajnica Nadvožnjak km 13+288 2020 – 2022 Zemun polje Završeno
Radovi na sanaciji kosine od km 59+100 do km 59+210 na pruzi Crveni Krst – Zaječar – Prahovo Pristanište Kosine od km 59+100 do km 59+210 na pruzi Crveni Krst – Zaječar – Prahovo Pristanište 2021 – 2022 od km 59+100 do km 59+210 na pruzi Crveni Krst – Zaječar – Prahovo Pristanište Završeno
Popravka oštećenih delova mosta u km 117+097 pruge Stalać – Kraljevo – Požega Most u km 117+097 pruge Stalać – Kraljevo – Požega 2021 Međuvršje Završeno